Winnipeg 2026 Bathroom Renovation Quotation
Winnipeg 2026 Bathroom Renovation Quotation
Decoration Style 1:

| BATHROOM RENOVATION QUOTATION (Decoration Style 1) | |
| From: Toplly | |
| Address: Winnipeg, MB, Canada | |
| Date: May 8, 2026 | |
| Quote #: BR-2026-001 | |
| To: Valued Customer (AUGUSTINE) | |
| Project: Modern Bathroom Remodel | |
| 1. MATERIALS & FIXTURES | |
| Description | Amount (CAD) |
| Modern solid wood Bathroom Cabinet | $450.00 |
| Cabinet Sintered Stone Countertop | $350.00 |
| 2 Bathroom Sink + 2 Modern Sink Faucet | $250.00 |
| Ultra-Swirl Siphon Jet Toilet , Water-Saving, Odor-Resistant, and Quiet-Flush | $80.00 |
| Acrylic Shower Base (White, Anti-slip) | $195.00 |
| BathTub Surround Wall | $220.00 |
| Frameless Glass Shower Door (Tempered Safety Glass) | $650.00 |
| Big size Shower Rain Shower System | $150.00 |
| Large Modern LED Backlit Mirror (Approx. 2.1m width) | $380.00 |
| Vanity Light Fixture (LED, Modern Style) | $180.00 |
| Wall Tiles (Mirror Backsplash) | $300.00 |
| Floor Tiles (Porcelain, Modern Grey/Beige) | $300.00 |
| Installation Supplies (Waterproofing, Grout, Thin-set) | $400.00 |
| Total Amount | $3,905.00 |
| 2. LABOR & SERVICES | |
| Description | Estimated Amount (CAD) |
| Demolition: Removal of tub, floor/wall tiles,bathroom cabinet, mirror, toilet | $1,200.00 |
| Plumbing: Drain relocation, tub-to-shower conversion, install faucet | $1,100.00 |
| Tiling: Professional installation of floor, and mirror backsplash | $900.00 |
| Installation: bathroom cabinet, toilet, shower door, mirror, and light fixtures | $1,500.00 |
| Misc: Electrical wiring adjustment and site cleanup | $200.00 |
| Total Amount | $4,900.00 |
| Subtotal (Materials): | $3,905.00 |
| Subtotal (Labor): | $4,900.00 |
| GRAND TOTAL: | $8805 |
Decoration Style 2:

| BATHROOM RENOVATION QUOTATION (Decoration Style 2) | |
| From: Toplly | |
| Address: Winnipeg, MB, Canada | |
| Date: May 8, 2026 | |
| Quote #: BR-2026-001 | |
| To: Valued Customer | |
| Project: Modern Bathroom Remodel | |
| 1. MATERIALS & FIXTURES | |
| Description | Amount (CAD) |
| Modern solid wood Bathroom Cabinet | $450.00 |
| Cabinet Sintered Stone Countertop | $350.00 |
| 2 Bathroom Sink + 2 Modern Sink Faucet | $250.00 |
| Ultra-Swirl Siphon Jet Toilet , Water-Saving, Odor-Resistant, and Quiet-Flush | $80.00 |
| Acrylic Shower Base (White, Anti-slip) | $195.00 |
| BathTub Surround Wall | $220.00 |
| Frameless Glass Shower Door (Tempered Safety Glass) | $650.00 |
| Big size Shower Rain Shower System | $150.00 |
| Large Modern LED Backlit Mirror (Approx. 2.1m width) | $380.00 |
| Vanity Light Fixture (LED, Modern Style) | $180.00 |
| Shower door area Wall Tiles + Mirror wall Backsplash | $700.00 |
| Floor Tiles (Porcelain, Modern Grey/Beige) | $300.00 |
| Installation Supplies (Waterproofing, Grout, Thin-set) | $400.00 |
| Total Amount | $4,305.00 |
| 2. LABOR & SERVICES | |
| Description | Estimated Amount (CAD) |
| Demolition: Removal of tub, floor/wall tiles,bathroom cabinet, mirror, toilet | $1,200.00 |
| Plumbing: Drain relocation, tub-to-shower conversion, install faucet | $1,100.00 |
| Tiling: Professional installation of floor, shower wall and mirror backsplash | $1,500.00 |
| Installation: bathroom cabinet, toilet, shower door, mirror, and light fixtures | $1,500.00 |
| Misc: Electrical wiring adjustment and site cleanup | $200.00 |
| Total Amount | $5,500.00 |
| Subtotal (Materials): | $4,305.00 |
| Subtotal (Labor): | $5,500.00 |
| GRAND TOTAL: | $9805 |
Note:
Ⅰ. Highly recommend going with a high-quality shower base instead of a traditional tiled floor.


Here’s why: In winnipeg climate, houses tend to settle and shift slightly. With a tiled floor, that movement can cause grout to crack, leading to hidden leaks that are very expensive to fix later. A shower base is a single, solid piece, so it’s virtually leak-proof. From a lifestyle perspective, you won't have to deal with scrubbing moldy grout lines every weekend. It’s a much cleaner, more 'set-it-and-forget-it' solution. As you can see in the 3D rendering, the white base creates a very sharp, clean look that perfectly complements the modern vanity and glossy wall tiles. It’s safer, faster to install, and will stay looking brand new for years.
Ⅱ. Regarding the vanity bathroom cabinet, we use a solid wood cabinet body, which offers a high-end and elegant appearance. For the countertop, we use sintered stone, featuring two sinks and two high-quality faucets. Please see the analysis below for the benefits of using sintered stone for the countertop.
Four Reasons to Choose Sintered Stone

-
Mohs Hardness Level 6: Scratch and Wear Resistant
Detail: With a hardness level of 6, it leaves no marks even when scratched forcefully with blades or knives. - Fireproof and Heat Resistant up to 1200°C
Detail: Forged under high temperature and pressure, it is fire-rated at 1200°C and unaffected by extreme heat. - 0.02% Water Absorption: High Density and Stain Resistant
Detail: Whether it's coffee, oil, or other stains, a simple wipe restores it to a brand-new look. - Food-Grade Eco-Friendly Material: Zero Formaldehyde
Detail: Free of heavy metals and harmful substances; safe for direct food contact and provides healthy protection.
Ⅲ . As for the shower glass door, we will use 8mm explosion-proof tempered glass with a stainless steel frame. This ensures long-lasting use without rusting and is easy to clean. It also comes equipped with deluxe heavy-duty rollers for smooth operation.

More shower door style available for your choice:




